nyash-codex 4ab6c4e6b3 docs(joinir): Phase 77 - BindingId expansion plan
Phase 77 design finalizes BindingId infrastructure migration with comprehensive
implementation roadmap. Three design documents outline expansion of promoted_bindings
tracking to Pattern3/4 and legacy code deprecation strategy.

Documents:
- phase77-expansion-completion.md: Architecture overview + 5 implementation tasks
- PHASE_77_IMPLEMENTATION_GUIDE.md: Step-by-step code changes with exact locations
- PHASE_77_EXECUTIVE_SUMMARY.md: Impact analysis and success metrics

Key decisions:
- DigitPosPromoter/TrimLoopHelper populate promoted_bindings
- Pattern3/4 use BindingId priority in variable resolution
- 3-phase deletion strategy (Deprecate→Require→Delete)
- Dev-only feature gate preserves zero production impact

Phase 77 implementation: ~2-3 hours (5 tasks: promoters + patterns + legacy + tests)

🤖 Generated with Claude Code

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2025-12-13 05:35:35 +09:00

9.8 KiB

Phase 77: Executive Summary - BindingId Migration Expansion

Status: DESIGN COMPLETE - Ready for Implementation Date: 2025-12-13 Estimated Implementation: 2-3 hours Risk Level: LOW (dev-only, dual-path design)


One-Paragraph Summary

Phase 77 completes the BindingId migration foundation by populating promoted_bindings in DigitPos/Trim promoters, extending BindingId lookup to Pattern3/4, and deprecating legacy name-based code (~40 lines of string hacks). This achieves type-safe, shadowing-aware promotion tracking across all JoinIR patterns while maintaining 100% backward compatibility via dual-path design.


What Changed

Infrastructure (Phase 74-76)

  • Phase 74: MirBuilder.binding_map added
  • Phase 75: BindingId priority lookup in ConditionEnv
  • Phase 76: promoted_bindings data structure in CarrierInfo

Phase 77 Additions (DESIGN READY)

  1. DigitPosPromoter Integration (45 min)

    • Add binding_map parameter to DigitPosPromotionRequest
    • Record promoted bindings: digit_pos (BindingId(5)) → is_digit_pos (BindingId(10))
    • Thread binding_map through call chain
  2. TrimLoopHelper Integration (30 min)

    • Add binding_map parameter to TrimPromotionRequest
    • Record promoted bindings: ch (BindingId(6)) → is_ch_match (BindingId(11))
    • Similar pattern to DigitPos
  3. Pattern3/4 BindingId Lookup (45 min)

    • Add dev-only BindingId-aware ConditionEnv construction
    • Use Phase 75 resolve_var_with_binding() API
    • Fallback to name-based for production (dual-path)
  4. Legacy Code Deprecation (15 min)

    • Deprecate CarrierInfo::resolve_promoted_join_id() (~25 lines)
    • Add fallback warnings in Pattern2ScopeManager (~10 lines)
    • Document deletion criteria for Phase 78+
  5. E2E Verification Tests (30 min)

    • Test DigitPos end-to-end BindingId flow
    • Test Trim end-to-end BindingId flow
    • Test Pattern3 BindingId lookup
    • Test Pattern4 BindingId lookup

Architecture Evolution

Before Phase 77 (Fragile Name-Based)

// CarrierInfo::resolve_promoted_join_id (FRAGILE!)
let candidates = [
    format!("is_{}", original_name),       // DigitPos pattern
    format!("is_{}_match", original_name), // Trim pattern
];
for carrier_name in &candidates {
    if let Some(carrier) = self.carriers.iter().find(|c| c.name == *carrier_name) {
        return carrier.join_id;  // String matching! 😱
    }
}

Problems:

  • Brittle naming conventions
  • No compiler protection
  • Shadowing-unaware
  • Pattern-specific hacks

After Phase 77 (Type-Safe BindingId)

// CarrierInfo::promoted_bindings (TYPE-SAFE!)
pub promoted_bindings: BTreeMap<BindingId, BindingId>,  // Original → Promoted

// Phase 77: Promoter populates the map
carrier_info.record_promoted_binding(
    BindingId(5),   // digit_pos
    BindingId(10),  // is_digit_pos
);

// Phase 76: ScopeManager resolves via BindingId
if let Some(promoted_bid) = carrier_info.resolve_promoted_with_binding(original_bid) {
    return condition_env.resolve_var_with_binding(Some(promoted_bid), name);
}

Benefits:

  • Type-safe (compiler-checked BindingId identity)
  • Shadowing-aware (BindingId unique per binding)
  • Pattern-agnostic (works for all promotions)
  • No name collisions

Implementation Files

Files to Modify

  1. Promoters (populate promoted_bindings):

    • src/mir/loop_pattern_detection/loop_body_digitpos_promoter.rs
    • src/mir/loop_pattern_detection/trim_loop_helper.rs
    • src/mir/loop_pattern_detection/loop_body_cond_promoter.rs
  2. Pattern Lowering (BindingId lookup):

    • src/mir/builder/control_flow/joinir/patterns/pattern3_with_if_phi.rs
    • src/mir/builder/control_flow/joinir/patterns/pattern4_with_continue.rs
  3. Legacy Deprecation:

    • src/mir/join_ir/lowering/carrier_info.rs (deprecate resolve_promoted_join_id)
    • src/mir/join_ir/lowering/scope_manager.rs (add fallback warnings)
  4. Tests (new):

    • tests/phase77_binding_promotion.rs (or add to existing)

Lines of Code

  • Add: ~150 lines (promoter integration + tests)
  • Deprecate: ~40 lines (legacy name-based code)
  • Delete: 0 lines (Phase 78+)
  • Net Change: ~+110 lines (mostly tests)

Migration Strategy

Phase 77 Scope (THIS PHASE)

WILL DO:

  • Populate promoted_bindings (DigitPos/Trim)
  • Extend BindingId lookup (Pattern3/4 dev-only)
  • Deprecate legacy code (add warnings)
  • Add E2E tests (4 tests)

WILL NOT DO (deferred to Phase 78+):

  • Delete legacy code (keep dual-path)
  • Make BindingId required in production
  • Remove promoted_loopbodylocals field

Why Gradual Migration?

3-Phase Deletion Strategy:

  1. Phase 77: Deprecate + Log (observe fallback usage)
  2. Phase 78: Require BindingId in production paths
  3. Phase 79: Delete legacy code entirely

Benefits:

  • No "big bang" rewrites
  • Fallback paths for debugging
  • Easy rollback if issues arise
  • Production builds unaffected

Test Coverage

Acceptance Criteria

  • cargo build --lib --features normalized_dev succeeds
  • cargo test --release --lib 958/958 PASS (baseline)
  • New Phase 77 tests pass (4/4)
  • No regressions in existing tests
  • Deprecation warnings logged (verify with JOINIR_TEST_DEBUG=1)

Test Matrix

Test Purpose Expected Result
test_phase77_digitpos_end_to_end DigitPos promotes + resolves via BindingId PASS
test_phase77_trim_end_to_end Trim promotes + resolves via BindingId PASS
test_phase77_pattern3_binding_lookup P3 uses BindingId priority lookup PASS
test_phase77_pattern4_binding_lookup P4 uses BindingId priority lookup PASS

Impact Analysis

Performance

Zero Impact:

  • All changes feature-gated (#[cfg(feature = "normalized_dev")])
  • Production builds identical to Phase 76
  • BindingId lookup is O(log n) BTreeMap (same as name-based)

Code Maintainability

Significant Improvement:

  • Before: 40 lines of string matching, brittle naming conventions
  • After: Type-safe BindingId mapping, compiler-checked identity
  • Reduction: ~40 lines of fragile code → deprecated (deleted in Phase 78+)

Risk Assessment

LOW RISK:

  • Dev-only changes (production unaffected)
  • Dual-path design (fallback always available)
  • Comprehensive test coverage (4 E2E tests)
  • Gradual migration (3-phase deletion)

Documentation

Created Documents

  1. phase77-expansion-completion.md (~300 lines)

    • Architecture overview
    • Implementation tasks (1-5)
    • Migration strategy
    • Design Q&A
  2. PHASE_77_IMPLEMENTATION_GUIDE.md (~500 lines)

    • Step-by-step code changes
    • Exact file locations
    • Testing checklist
    • Troubleshooting guide
  3. PHASE_77_EXECUTIVE_SUMMARY.md (this document)

    • High-level overview
    • Impact analysis
    • Decision rationale

Updated Documents


Next Steps

For Implementation (ChatGPT)

  1. Read Implementation Guide:

  2. Verify Baseline:

    • cargo build --lib succeeds
    • cargo test --release --lib 958/958 PASS
  3. Implement Changes:

    • Task 1: DigitPosPromoter (45 min)
    • Task 2: TrimLoopHelper (30 min)
    • Task 3: Pattern3/4 (45 min)
    • Task 4: Deprecation (15 min)
    • Task 5: Tests (30 min)
    • Task 6: Docs (15 min)
  4. Verify Completion:

    • All tests pass (958 + 4 new)
    • Deprecation warnings visible
    • Documentation updated

For Future Phases

Phase 78-LEGACY-DELETION (1-2 hours):

  • Remove deprecated code (~40 lines)
  • Make BindingId required in production paths
  • Delete promoted_loopbodylocals field
  • Full type-safety enforcement

Success Metrics

When Phase 77 is complete:

Functional:

  • All promoters populate promoted_bindings
  • Pattern3/4 use BindingId lookup (dev-only)
  • E2E tests verify end-to-end flow

Quality:

  • Legacy code deprecated (not deleted)
  • Fallback warnings added
  • Documentation complete

Stability:

  • 958/958 tests PASS (no regressions)
  • Production builds unaffected
  • Dual-path design maintained

Future-Ready:

  • Phase 78 deletion path clear
  • Migration strategy proven
  • Type-safety foundation complete

Conclusion

Phase 77 represents the final implementation step of the BindingId migration (Phases 73-77), establishing type-safe promotion tracking across all JoinIR patterns while maintaining 100% backward compatibility.

Key Achievement: Eliminates ~40 lines of fragile string matching, replacing it with compiler-checked BindingId identity that is shadowing-aware and pattern-agnostic.

Foundation for Phase 78+: With Phase 77 complete, Phase 78 can safely delete deprecated code and enforce BindingId-only paths in production, achieving full type-safety with zero legacy baggage.

Time Investment: ~3 hours implementation + ~2 hours documentation = 5 hours total for a major architectural improvement that pays dividends in maintainability and correctness.


  • Phase 73: ScopeManager BindingId design (SSOT)
  • Phase 74: Infrastructure (MirBuilder.binding_map)
  • Phase 75: Pilot (ConditionEnv.resolve_var_with_binding)
  • Phase 76: Promotion Infra (CarrierInfo.promoted_bindings)
  • Phase 77: Expansion (this phase) ← WE ARE HERE
  • Phase 78+: Legacy Deletion (future)

Prepared by: Claude Code (Analysis & Design) Implementation: ChatGPT (pending) Review: User (after implementation)

Status: Ready for Implementation