Files
hakorune/docs/development/current/main/phase74-checklist.md
nyash-codex e1574af741 feat(mir): Phase 74 - BindingId infrastructure (dev-only)
Phase 74 implements BindingId as parallel allocation alongside ValueId for
lexical scope tracking and shadowing-aware variable identity.

Changes:
- binding_id.rs: New BindingId type with overflow protection (5 unit tests)
- builder.rs: Added next_binding_id counter and binding_map (4 integration tests)
- lexical_scope.rs: Extended restoration logic for BindingId management
- mod.rs: Public re-export of BindingId

Tests: 9/9 new PASS, lib 958/958 PASS (no regressions)
Architecture: Parallel BindingId/ValueId allocation for deterministic shadowing

Phase 75-77 will build on this infrastructure for type-safe promotion tracking.

🤖 Generated with Claude Code

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2025-12-13 05:34:56 +09:00

5.7 KiB

Phase 74: BindingId Infrastructure - Completion Checklist

Implementation Checklist

Core Files

  • src/mir/binding_id.rs created

    • BindingId(u32) struct with overflow protection
    • new(), next(), raw() methods
    • Display trait implementation
    • 5 unit tests (creation, next, display, ordering, overflow)
  • src/mir/mod.rs updated

    • Added pub mod binding_id;
    • Re-exported pub use binding_id::BindingId;
  • src/mir/builder.rs extended

    • next_binding_id: u32 field added
    • binding_map: BTreeMap<String, BindingId> field added
    • allocate_binding_id() method implemented
    • Initialization in MirBuilder::new()
    • 4 unit tests added (initialization, sequential, shadowing, parallel)
  • src/mir/builder/vars/lexical_scope.rs updated

    • restore_binding: BTreeMap<String, Option<BindingId>> field added to LexicalScopeFrame
    • pop_lexical_scope() restores binding_map
    • declare_local_in_current_scope() allocates BindingIds

Documentation

  • docs/development/current/main/phase74-bindingid-infrastructure.md

    • Architecture (ValueId vs BindingId)
    • Implementation details
    • Test strategy
    • Next steps (Phase 75-77)
  • docs/development/current/main/PHASE_74_SUMMARY.md

    • Implementation summary
    • Test results
    • Key design decisions
  • docs/development/current/main/phase74-checklist.md (this file)


Test Results

Unit Tests (9 total)

$ cargo test --lib binding_id
test mir::binding_id::tests::test_binding_id_creation ... ok
test mir::binding_id::tests::test_binding_id_next ... ok
test mir::binding_id::tests::test_binding_id_display ... ok
test mir::binding_id::tests::test_binding_id_ordering ... ok
test mir::binding_id::tests::test_binding_id_overflow - should panic ... ok
test mir::builder::binding_id_tests::test_binding_map_initialization ... ok
test mir::builder::binding_id_tests::test_binding_allocation_sequential ... ok
test mir::builder::binding_id_tests::test_shadowing_binding_restore ... ok
test mir::builder::binding_id_tests::test_valueid_binding_parallel_allocation ... ok

test result: ok. 9 passed; 0 failed; 0 ignored

Regression Tests

$ cargo test --release --lib
test result: ok. 958 passed; 0 failed; 56 ignored

$ cargo test --features normalized_dev --test normalized_joinir_min
test result: ok. 54 passed; 0 failed; 0 ignored

Build Success

$ cargo build --lib
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12.76s

Acceptance Criteria

Criterion Status Evidence
cargo build --lib succeeds Compiled without errors
cargo test --release --lib passes 958 tests passed
cargo test --features normalized_dev --test normalized_joinir_min passes 54 tests passed
New tests all pass 9/9 BindingId tests passed
No production impact Infrastructure-only, no behavior changes
Phase 73 PoC structure replicated Same design as PoC, integrated into main

Design Validation

Architecture Principles

  • Parallel Allocation: ValueId and BindingId independent
  • Determinism: BTreeMap used (Phase 25.1 consistency)
  • Symmetric Restoration: Both maps restored on scope exit
  • Overflow Protection: debug_assert! checks in critical paths

Phase 73 Compatibility

  • BindingId type matches PoC design
  • allocate_binding_id() API matches PoC
  • Lexical scope integration matches PoC
  • Test strategy follows PoC validation

Code Quality

Documentation

  • All public APIs documented
  • Architecture overview written
  • Examples provided
  • Migration roadmap defined

Testing

  • Unit tests for BindingId type
  • Integration tests for MirBuilder
  • Shadowing edge cases tested
  • Parallel allocation verified

Code Style

  • Follows existing MirBuilder patterns
  • Consistent with Phase 25.1 BTreeMap usage
  • Clear variable names
  • Proper error messages

Next Steps (Phase 75)

Pilot Integration Planning

  • Identify 1-2 candidate files for pilot usage
  • Design logging strategy (e.g., NYASH_BINDING_TRACE=1)
  • Create pilot smoke tests
  • Document pilot integration approach

Suggested Pilot Components

  1. src/mir/builder/vars/ - Local variable tracking (high shadowing frequency)
  2. src/mir/builder/stmts.rs - Statement lowering (control flow + shadowing)

Pilot Success Criteria

  • BindingId used in 1-2 isolated components
  • Logging shows correct BindingId allocation/restoration
  • Smoke tests pass with pilot integration
  • No behavior changes observed

Commit Message Template

feat(mir): Phase 74 - BindingId infrastructure

Establish parallel BindingId allocation system alongside ValueId to support
future ScopeManager migration (Phase 75+).

Changes:
- Add src/mir/binding_id.rs (BindingId type + 5 tests)
- Extend MirBuilder with binding_map and allocate_binding_id()
- Update lexical_scope.rs for parallel restoration
- Add 4 integration tests in builder.rs
- Document architecture and migration roadmap

Test results:
- 9 new unit tests (all pass)
- 958 lib tests (no regressions)
- 54 normalized JoinIR tests (no regressions)

Phase 74 complete ✅ - Ready for Phase 75 pilot integration

Sign-off

Phase 74 Implementation: Complete Test Coverage: Full (9 unit + existing smoke) Documentation: Comprehensive (~500 lines) Production Impact: Zero (infrastructure-only) Ready for Phase 75: Yes


Date: 2025-12-13 Reviewer: (awaiting review) Status: Ready for integration