Phase 20.8: GC + Rust Deprecation - Document Index
Phase: 20.8 Duration: 6 weeks (2026-07-20 → 2026-08-30) Status: Not Started
📚 Document Structure
Core Documents
-
README.md (日本語)
- Phase 20.8 概要
- Phase E: GC v0 (Week 1-4)
- Phase F: Rust VM Deprecation (Week 5-6)
- 成功基準
- マイルストーン
-
PLAN.md (English)
- Executive summary
- Week-by-week implementation plan
- GC implementation details
- Rust VM deprecation strategy
- Bit-identical verification
- Success criteria
-
CHECKLIST.md (タスクリスト)
- Week 1-4: GC v0 implementation
- Week 5-6: Rust VM deprecation
- Self-compilation verification
- Rust layer audit
-
INDEX.md (このファイル)
- Document structure
- Quick reference
- Related phases
🎯 Quick Reference
Phase E: GC v0 (Week 1-4)
Goal: Implement Mark & Sweep garbage collection in Hakorune
Key Features:
- Stop-the-world GC
- Mark phase: Trace reachable objects from roots
- Sweep phase: Free unreachable objects
- GC Roots: Stack frames, global static boxes, HandleRegistry
- Metrics: Allocation count, survivor count, sweep time
- Observability:
HAKO_GC_TRACE=1
Deliverables:
- GcBox implementation (Mark & Sweep)
- GcMetricsBox (metrics collection)
- VM integration (allocation hook, GC trigger)
- Tests: Golden tests, smoke tests
Phase F: Rust VM Deprecation (Week 5-6)
Goal: Deprecate Rust VM and achieve true self-hosting
Key Features:
- Hakorune-VM is default (
--backend vm) - Rust-VM opt-in (
--backend vm-rust, with warning) - Bit-identical self-compilation (Hako₁ → Hako₂ → Hako₃)
- Rust layer ≤ 100 lines (HostBridge API only)
Deliverables:
- CLI updated (Hakorune-VM default)
- Deprecation warning added
- Self-compilation verification script
- CI integration (daily verification)
- Rust layer audit (≤ 100 lines)
✅ Success Criteria Summary
Phase E (GC v0)
- GC v0 works (no memory leaks)
- Mark & Sweep correct
- GC roots detected (stack, global, handles)
- Metrics collection working
HAKO_GC_TRACE=1provides detailed logs
Phase F (Rust VM Deprecation)
- Hakorune-VM is default backend
- Rust-VM deprecated (warning displayed)
- Bit-identical self-compilation verified
- CI daily verification passes
- Rust layer ≤ 100 lines
Overall
- True Self-Hosting: Hakorune IS Hakorune
- Rust=floor, Hakorune=house: Architecture realized
- All smoke tests pass with Hakorune-VM
🔗 Related Phases
Prerequisites
-
Phase 20.7 (Collections): ../phase-20.7/README.md
- MapBox in Hakorune
- ArrayBox in Hakorune
- Deterministic behavior
-
Phase 15.80 (VM Core): ../phase-15.80/README.md
- 16 MIR instructions
- Control flow
- Dispatch unification
-
Phase 20.5 (HostBridge): ../phase-20.5/README.md
- HostBridge API (C-ABI)
- Op_eq migration
- VM foundations PoC
Follow-up Phases
- Phase 15.82 (Advanced GC & Optimization): TBD
- Generational GC
- Incremental GC
- Performance optimization
- JIT compilation
📖 Additional Resources
Pure Hakorune Roadmap
- PURE_HAKORUNE_ROADMAP.md
- 36-week timeline (2025-12-21 → 2026-09-30)
- 6 phases: A → B → C → D → E → F
- "Rust=floor, Hakorune=house" vision
Technical Specifications
-
- C-ABI boundary
- HostBridge API spec
- Error handling (TLS)
-
- Equality logic migration
- NoOperatorGuard pattern
- Golden tests
Experimental Tracks (not adopted yet)
- HakMem — C‑ABI Allocator (paper; dev only)
- docs/private/papers-active/hakmem-c-abi-allocator/README.md
- HakMem POC (app skeleton; no wiring)
- apps/experiments/hakmem-poc/README.md
Architecture Documents
-
- Everything is Box
- BoxCall vs ExternCall
- Unified invocation
-
- 16 frozen instructions
- MIR semantics
- VM execution model
🧪 Testing Strategy
Golden Tests
Goal: Prove Hakorune-VM produces identical output to Rust-VM
Test Suite:
tests/golden/
├── arithmetic.hako # Basic arithmetic
├── control_flow.hako # if/loop/branch
├── collections.hako # Array/Map operations
├── recursion.hako # Recursive functions
├── strings.hako # String manipulation
├── enums.hako # @enum types
├── closures.hako # Closure capture
└── selfhost_mini.hako # Mini compiler
Verification:
# Run same program on both VMs
./hako --backend vm-rust test.hako > rust_output.txt
./hako --backend vm test.hako > hako_output.txt
# Compare outputs
diff rust_output.txt hako_output.txt
# Expected: No differences
Self-Compilation Verification
Goal: Prove Hakorune compiler is bit-identical across generations
Verification Chain:
# Hako₁: Rust-based compiler
cargo build --release
cp target/release/hako hako_1
# Hako₂: Compiled by Hako₁
./hako_1 apps/selfhost-compiler/main.hako -o hako_2
# Hako₃: Compiled by Hako₂
./hako_2 apps/selfhost-compiler/main.hako -o hako_3
# Verify bit-identical
diff hako_2 hako_3 # Expected: No differences
GC Tests
Goal: Verify GC correctness and performance
Test Categories:
- Leak Tests: Ensure no memory leaks
- Stress Tests: Allocate/free large number of objects
- Cycle Tests: Verify cyclic references are collected
- Root Tests: Verify all roots are traced
- Metrics Tests: Verify metrics accuracy
Tools:
HAKO_GC_TRACE=1: Detailed GC logs- Valgrind: Memory leak detection
- Custom GC metrics
📊 Milestones
Week 1-2: GC Mark Phase
- GC roots detection
- Mark algorithm
- Cycle detection
- Tests: Mark correctness
Week 3-4: GC Sweep Phase & Metrics
- Sweep algorithm
- Metrics collection
HAKO_GC_TRACE=1- Integration & testing
Week 5: Backend Switching & Deprecation
- Hakorune-VM default
- Rust-VM deprecation warning
- Golden tests verification
- Documentation updates
Week 6: Bit-Identical Verification & Audit
- Self-compilation chain
- CI integration
- Rust layer audit (≤ 100 lines)
- Final documentation
🎉 Final Success Impact
Before Phase 20.8
Rust Layer:
├── VM implementation (~5000 lines)
├── Collections (MapBox, ArrayBox) (~2000 lines)
├── GC (reference counting) (~500 lines)
└── HostBridge API (~100 lines)
Hakorune Layer:
├── Parser (selfhost-compiler)
└── Standard library
After Phase 20.8
Rust Layer (~100 lines):
└── HostBridge API (C-ABI only)
Hakorune Layer (everything else):
├── VM (MiniVmBox)
├── Parser (MirJsonBuilderBox)
├── Collections (MapBox, ArrayBox)
├── GC (GcBox)
└── Standard library (StringBox, IntegerBox, etc.)
Achievement: "Rust=floor, Hakorune=house" ✅
True Self-Hosting: Hakorune IS Hakorune
🚀 Next Steps
After Phase 20.8 completion:
-
Phase 15.82 (Advanced GC):
- Generational GC
- Incremental GC
- Write barriers
-
Performance Optimization:
- JIT compilation
- Inline caching
- Type specialization
-
Language Features:
- Async/await
- Generators
- Pattern matching
-
Tooling:
- Debugger
- Profiler
- Language server
Status: Not Started Start Date: 2026-07-20 Target Completion: 2026-08-30 Dependencies: Phase 20.7 complete
Last Updated: 2025-10-14