nyash-codex 851bf4f8a5 design(joinir): Phase 73 - ScopeManager BindingId Migration Design + PoC
Phase 73 plans migration from name-based to BindingId-based scope management
in JoinIR lowering, aligning with MIR's lexical scope model.

Design decision: Option A (Parallel BindingId Layer) with gradual migration.
Migration roadmap: Phases 74-77, ~8-12 hours total, zero production impact.

Changes:
- phase73-scope-manager-design.md: SSOT design (~700 lines)
- phase73-completion-summary.md: Deliverables summary
- phase73-index.md: Navigation index
- scope_manager_bindingid_poc/: Working PoC (437 lines, dev-only)

Tests: 6/6 PoC tests PASS, lib 950/950 PASS
Implementation: Parallel layer (no changes to existing code paths)

🤖 Generated with Claude Code

Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
2025-12-13 03:41:40 +09:00

6.8 KiB

Phase 73: BindingId-Based Scope Manager - Index

Status: Complete (Design Phase) Date: 2025-12-13


📋 Core Documents

  1. Design Document (SSOT) - Complete design specification
  2. Completion Summary - Phase 73 deliverables and next steps

💻 Code

  • PoC Implementation: src/mir/join_ir/lowering/scope_manager_bindingid_poc/mod.rs
    • Feature-gated: #[cfg(feature = "normalized_dev")]
    • Tests: 6/6 passing

What is Phase 73?

Purpose: Design a BindingId-based scope management system for JoinIR lowering to align with MIR's lexical scope model.

Problem:

  • MIR builder uses BindingId for shadowing (Phase 68-69)
  • JoinIR lowering uses name-based lookup (fragile, string matching)
  • Mismatch creates future bug risk

Solution:

  • Introduce BindingId into JoinIR's ScopeManager
  • Gradual migration (Phases 74-77)
  • Eliminate naming convention hacks (is_digit_pos, is_ch_match)

Phase 73 Deliverables

Design Document

File: phase73-scope-manager-design.md

Contents (34 sections, ~700 lines):

  • Current state analysis (MIR + JoinIR scope systems)
  • Problem identification (shadowing, naming brittleness)
  • Proposed architecture (Option A: Parallel BindingId Layer)
  • Integration with MirBuilder (binding_map additions)
  • Migration roadmap (Phases 74-77)
  • Example scenarios (shadowing, promoted variables)

Proof-of-Concept

File: src/mir/join_ir/lowering/scope_manager_bindingid_poc/mod.rs

Highlights:

  • BindingId type wrapper
  • ConditionEnvV2 (parallel name + BindingId lookup)
  • CarrierInfoV2 (BindingId-based promotion)
  • ScopeManagerV2 trait + implementation

Test Results:

running 6 tests
test test_condition_env_v2_basic ... ok
test test_shadowing_simulation ... ok
test test_promoted_binding_resolution ... ok
test test_scope_manager_v2_binding_lookup ... ok
test test_scope_manager_v2_promoted_lookup ... ok
test test_unified_lookup_fallback ... ok

Migration Roadmap

Phase 74: Infrastructure (2-3 hours)

  • Add binding_map to MirBuilder
  • Add binding_to_join to ConditionEnv
  • BindingId allocator

Phase 75: Pattern 1 Pilot (1-2 hours)

  • Migrate simplest pattern (no carriers)
  • Prove BindingId integration works

Phase 76: Pattern 2 Promotion (2-3 hours)

  • Eliminate naming convention hacks
  • BindingId-based carrier promotion

Phase 77: Pattern 3-4 + Cleanup (2-3 hours)

  • Complete migration
  • Remove legacy name-based code

Total Estimated Effort: 8-12 hours


Key Design Decisions

1. Gradual Migration (Option A)

Why: Low risk, backward compatible, easy rollback

Alternative Rejected: Full replacement (Option B) - too risky for Phase 73


2. Parallel Lookup Strategy

// Phase 74-76 (transition)
fn lookup(&self, name: &str) -> Option<ValueId> {
    // 1. Try BindingId lookup (new code)
    if let Some(binding) = self.name_to_binding.get(name) {
        if let Some(value) = self.binding_to_join.get(binding) {
            return Some(value);
        }
    }
    // 2. Fallback to name lookup (legacy code)
    self.name_to_join.get(name).copied()
}

3. Per-Function BindingId Scope

Decision: Each function has independent BindingId allocation

Reasoning:

  • Like ValueId (proven model)
  • No global state needed
  • Simpler implementation

Alternative: Global BindingId pool (for Phase 63 integration) - deferred


No Production Impact

Guarantee:

  • No changes to production code (except 1 line mod.rs)
  • PoC is feature-gated (normalized_dev)
  • All existing tests pass (1049 tests)
  • Normal build unaffected

Modified Files (3 total):

  1. Design doc (new)
  2. Completion summary (new)
  3. PoC module (new, dev-only)
  4. mod.rs (1 line for PoC)

Success Metrics

Design Quality

  • SSOT document (34 sections)
  • Clear problem statement
  • Proposed architecture with examples
  • Integration points identified
  • Migration path defined

PoC Validation

  • Compiles under normalized_dev
  • All 6 tests passing
  • Demonstrates key concepts:
    • Parallel lookup (BindingId + name)
    • Shadowing simulation
    • Promoted variable resolution

Risk Mitigation

  • Feature-gated (no prod impact)
  • Gradual migration plan
  • Backward compatibility preserved
  • Clear rollback strategy

Open Questions (Phase 74+)

Q1: Performance

Concern: Dual maps double memory usage

Mitigation: Remove legacy maps after Phase 77, profile during Phase 74


Q2: Captured Variables

Question: How to add BindingId to CapturedVar?

Answer: Phase 76 task (update function_scope_capture module)


Q3: Phase 63 Integration

Question: Use global BindingId for ownership analysis?

Answer: Phase 78+ (future enhancement)


Completed Phases

  • Phase 68-69: MIR lexical scope + shadowing
  • Phase 231: ScopeManager trait (current impl)
  • Phase 224: Promoted LoopBodyLocal (naming convention)

Future Phases

  • Phase 74: BindingId infrastructure
  • Phase 75: Pattern 1 migration
  • Phase 76: Pattern 2 migration (carrier promotion)
  • Phase 77: Pattern 3-4 migration + cleanup

References

Design Documents

Code Files

  • src/mir/builder/vars/lexical_scope.rs - MIR lexical scope (existing)
  • src/mir/join_ir/lowering/scope_manager.rs - Current ScopeManager
  • src/mir/join_ir/lowering/carrier_info.rs - Current CarrierInfo
  • src/mir/join_ir/lowering/scope_manager_bindingid_poc/mod.rs - PoC (Phase 73)

For Implementation (Phase 74+)

  1. Design Document - Full context
  2. PoC Code - Concrete examples
  3. Completion Summary - Migration checklist

For Review

  1. This Index - Quick overview
  2. Completion Summary - What was delivered
  3. Design Document - Deep dive (if needed)

Contact / Questions

Phase 73 Design: Complete, ready for user review Next Steps: User approval → Phase 74 implementation

Estimated Timeline:

  • Phase 74: 1 week (infrastructure)
  • Phase 75: 2-3 days (Pattern 1)
  • Phase 76: 3-4 days (Pattern 2)
  • Phase 77: 3-4 days (Pattern 3-4 + cleanup)
  • Total: 2-3 weeks (leisurely pace)

Status: Phase 73 Complete - Ready for Phase 74