nyash-codex
c3a26e705e
feat(joinir): Phase 47-A-IMPL - P3 Normalized infrastructure
Implement Pattern3 (if-sum) Normalized infrastructure, extending existing P2
StepSchedule and ShapeGuard systems.
Key changes:
1. StepSchedule generalization (P2 → P2/P3):
- Renamed: pattern2_step_schedule.rs → step_schedule.rs
- Extended StepKind enum with P3 variants:
- IfCond (if condition in body)
- ThenUpdates (carrier updates in then branch)
- ElseUpdates (carrier updates in else branch)
- Added pattern3_if_sum_schedule() function
- Added unit test: test_pattern3_if_sum_schedule()
- Updated module references (mod.rs, loop_with_break_minimal.rs)
2. ShapeGuard extension:
- Added Pattern3IfSumMinimal variant to NormalizedDevShape
- Added is_pattern3_if_sum_minimal() detector (placeholder)
- Updated shape detector table
- Extended capability_for_shape() mapping
3. Bridge integration:
- bridge.rs: Added P3 shape handling in normalize_for_shape()
- normalized.rs: Added P3 roundtrip match (uses P2 temporarily)
4. P2/P3 separation:
- loop_with_break_minimal.rs: Added panic for P3 steps in P2 lowering
- Clear boundary enforcement (P2 lowerer rejects P3 steps)
5. Documentation:
- CURRENT_TASK.md: Phase 47-A-IMPL status
- phase47-norm-p3-design.md: Implementation status section
Benefits:
- Reuses 90% of P2 infrastructure (ConditionEnv, CarrierInfo, ExitLine)
- Clean P2/P3 separation via StepKind
- Pure additive changes (no P2 behavioral changes)
- Ready for Phase 47-A-LOWERING (full P3 Normalized implementation)
Tests: 938/938 PASS (+1 from step_schedule unit test)
- All existing P1/P2 tests pass (no regressions)
- P3 test uses Structured path temporarily (proper lowering in next phase)
Next phase: Implement full P3 Normalized→MIR(direct) lowering
2025-12-12 05:23:18 +09:00
..
2025-09-17 10:58:12 +09:00
2025-12-12 05:23:18 +09:00
2025-11-06 15:41:52 +09:00
2025-11-06 15:41:52 +09:00
2025-08-26 01:42:18 +09:00
2025-09-05 13:29:17 +09:00
2025-12-04 14:19:48 +09:00
2025-12-04 14:19:48 +09:00