Files
hakorune/docs/development/current
nyash-codex 889492b617 docs(joinir): Phase 80 Tasks 80-0/80-A - Status verification + design doc
Task 80-0: Current status verification
-  970/970 lib tests PASS (production stable)
-  Core VM smoke tests PASS (json_pp_vm)
-  Phase 79 E2E tests broken (AST API mismatch, out-of-scope)
-  Pre-existing json_lint_vm failure (Pattern2 verifier, out-of-scope)
- **Conclusion**: Phase 80 has ZERO blockers

Task 80-A: SSOT design doc created
- New: docs/development/current/main/phase80-bindingid-p3p4-plan.md (336 lines)
- Pattern3/4 BindingId wiring strategy
- Implementation order: 80-B (P3) → 80-C (P4) → 80-D (E2E)
- Code examples and success metrics
- Fallback detection mechanism (existing log tags)

Design principles (consistent with Phase 74-79):
- Dev-only code (feature-gated)
- Dual-path maintained (BindingId priority + name fallback)
- Structural detection only (NO by-name branching)
- Fail-Fast error handling
- Zero production impact

Updated docs:
- 01-JoinIR-Selfhost-INDEX.md: Phase 79 Activation status
- 10-Now.md: Phase 80 tasks 80-0/80-A complete
- 20-Decisions.md: BindingId migration complete status
- joinir-architecture-overview.md: Phase 79/80 sections

Next: Task 80-B (Pattern3 BindingId registration)
2025-12-13 17:26:15 +09:00
..