nyash-codex
889492b617
docs(joinir): Phase 80 Tasks 80-0/80-A - Status verification + design doc
Task 80-0: Current status verification
- ✅ 970/970 lib tests PASS (production stable)
- ✅ Core VM smoke tests PASS (json_pp_vm)
- ❌ Phase 79 E2E tests broken (AST API mismatch, out-of-scope)
- ❌ Pre-existing json_lint_vm failure (Pattern2 verifier, out-of-scope)
- **Conclusion**: Phase 80 has ZERO blockers
Task 80-A: SSOT design doc created
- New: docs/development/current/main/phase80-bindingid-p3p4-plan.md (336 lines)
- Pattern3/4 BindingId wiring strategy
- Implementation order: 80-B (P3) → 80-C (P4) → 80-D (E2E)
- Code examples and success metrics
- Fallback detection mechanism (existing log tags)
Design principles (consistent with Phase 74-79):
- Dev-only code (feature-gated)
- Dual-path maintained (BindingId priority + name fallback)
- Structural detection only (NO by-name branching)
- Fail-Fast error handling
- Zero production impact
Updated docs:
- 01-JoinIR-Selfhost-INDEX.md: Phase 79 Activation status
- 10-Now.md: Phase 80 tasks 80-0/80-A complete
- 20-Decisions.md: BindingId migration complete status
- joinir-architecture-overview.md: Phase 79/80 sections
Next: Task 80-B (Pattern3 BindingId registration)
2025-12-13 17:26:15 +09:00
..
2025-09-17 10:58:12 +09:00
2025-12-13 17:26:15 +09:00
2025-11-06 15:41:52 +09:00
2025-11-06 15:41:52 +09:00
2025-08-26 01:42:18 +09:00
2025-09-05 13:29:17 +09:00
2025-12-04 14:19:48 +09:00
2025-12-04 14:19:48 +09:00