nyash-codex 889492b617 docs(joinir): Phase 80 Tasks 80-0/80-A - Status verification + design doc
Task 80-0: Current status verification
-  970/970 lib tests PASS (production stable)
-  Core VM smoke tests PASS (json_pp_vm)
-  Phase 79 E2E tests broken (AST API mismatch, out-of-scope)
-  Pre-existing json_lint_vm failure (Pattern2 verifier, out-of-scope)
- **Conclusion**: Phase 80 has ZERO blockers

Task 80-A: SSOT design doc created
- New: docs/development/current/main/phase80-bindingid-p3p4-plan.md (336 lines)
- Pattern3/4 BindingId wiring strategy
- Implementation order: 80-B (P3) → 80-C (P4) → 80-D (E2E)
- Code examples and success metrics
- Fallback detection mechanism (existing log tags)

Design principles (consistent with Phase 74-79):
- Dev-only code (feature-gated)
- Dual-path maintained (BindingId priority + name fallback)
- Structural detection only (NO by-name branching)
- Fail-Fast error handling
- Zero production impact

Updated docs:
- 01-JoinIR-Selfhost-INDEX.md: Phase 79 Activation status
- 10-Now.md: Phase 80 tasks 80-0/80-A complete
- 20-Decisions.md: BindingId migration complete status
- joinir-architecture-overview.md: Phase 79/80 sections

Next: Task 80-B (Pattern3 BindingId registration)
2025-12-13 17:26:15 +09:00
..

Nyash Development Documentation 🔧

開発者向けの進行中タスクと開発計画ドキュメントです。

📂 ディレクトリ構造

current/

  • CURRENT_TASK.md - 現在進行中のタスク
  • アクティブな開発作業の詳細
  • 最新の実装状況

roadmap/

  • phases/ - フェーズ別開発計画
    • phase-8/ - AST→MIR変換
    • phase-9/ - VM/JIT実装
    • phase-10/ - AOT最適化
  • native-plan/ - ネイティブビルド計画
    • 実行バックエンド統合
    • パフォーマンス目標

proposals/

  • RFCRequest for Comments
  • 新機能提案
  • 設計ディスカッション

🎯 重要な参照先

  • 進行状況: current/CURRENT_TASK.md
  • 開発計画: roadmap/phases/
  • 技術提案: proposals/
  • ドキュメントのステータス/入口ポリシー: doc-status-policy.md
  • JoinIR / Selfhost の入口: current/main/01-JoinIR-Selfhost-INDEX.md

📝 注意事項

このディレクトリの内容は開発中であり、頻繁に変更されます。 安定した仕様はreference/を参照してください。