Task 80-0: Current status verification - ✅ 970/970 lib tests PASS (production stable) - ✅ Core VM smoke tests PASS (json_pp_vm) - ❌ Phase 79 E2E tests broken (AST API mismatch, out-of-scope) - ❌ Pre-existing json_lint_vm failure (Pattern2 verifier, out-of-scope) - **Conclusion**: Phase 80 has ZERO blockers Task 80-A: SSOT design doc created - New: docs/development/current/main/phase80-bindingid-p3p4-plan.md (336 lines) - Pattern3/4 BindingId wiring strategy - Implementation order: 80-B (P3) → 80-C (P4) → 80-D (E2E) - Code examples and success metrics - Fallback detection mechanism (existing log tags) Design principles (consistent with Phase 74-79): - Dev-only code (feature-gated) - Dual-path maintained (BindingId priority + name fallback) - Structural detection only (NO by-name branching) - Fail-Fast error handling - Zero production impact Updated docs: - 01-JoinIR-Selfhost-INDEX.md: Phase 79 Activation status - 10-Now.md: Phase 80 tasks 80-0/80-A complete - 20-Decisions.md: BindingId migration complete status - joinir-architecture-overview.md: Phase 79/80 sections Next: Task 80-B (Pattern3 BindingId registration)
Nyash Development Documentation 🔧
開発者向けの進行中タスクと開発計画ドキュメントです。
📂 ディレクトリ構造
current/
CURRENT_TASK.md- 現在進行中のタスク- アクティブな開発作業の詳細
- 最新の実装状況
roadmap/
- phases/ - フェーズ別開発計画
- phase-8/ - AST→MIR変換
- phase-9/ - VM/JIT実装
- phase-10/ - AOT最適化
- native-plan/ - ネイティブビルド計画
- 実行バックエンド統合
- パフォーマンス目標
proposals/
- RFC(Request for Comments)
- 新機能提案
- 設計ディスカッション
🎯 重要な参照先
- 進行状況:
current/CURRENT_TASK.md - 開発計画:
roadmap/phases/ - 技術提案:
proposals/ - ドキュメントのステータス/入口ポリシー:
doc-status-policy.md - JoinIR / Selfhost の入口:
current/main/01-JoinIR-Selfhost-INDEX.md
📝 注意事項
このディレクトリの内容は開発中であり、頻繁に変更されます。
安定した仕様はreference/を参照してください。