Files
hakorune/docs/予定
Moe Charm 4acc0459bb docs(copilot): add Phase 9.6 WASM independent implementation & split document
Phase 9.6: WASM独自実装 - wasmtime依存完全排除
- Add critical Phase 9.6 for wasmtime dependency elimination
- Pure WAT Generation approach for version compatibility issues
- BoxCall/ExternCall independent implementation
- Scheduled after Phase 9.5, before Phase 9.7
- 2-week implementation timeline with Copilot collaboration

Document split for maintainability:
- Split copilot_issues.txt (1200+ lines → ~600 lines)
- Archive Phase 0-9.4 to copilot_issues_phase0_to_94.txt
- Improve searchability and maintenance efficiency

WASM独自実装の革命的効果:
- wasmtime依存完全排除でバージョン互換性問題解決
- BoxCall/ExternCall完全実装で実用性達成
- Pure WAT Generation による軽量・高性能実現
- Everything is Box哲学の純粋実装

🤖 Generated with [Claude Code](https://claude.ai/code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-08-15 10:21:26 +09:00
..

🗺️ Nyash 予定(ロードマップ・タスク)

📋 現在進行中

🎯 最重要タスク

  • 現在のタスク: docs/CURRENT_TASK.md
  • Phase 8.3: Box操作WASM実装Copilot担当
  • Phase 8.4: ネイティブコンパイル実装計画AI大会議策定済み

🚀 ネイティブコンパイル計画 (2025-08-14策定)

📊 AI大会議成果

実装フェーズ

  • Phase A (2-3週間): AOT WASM → 500倍高速化目標
  • Phase B (2-3ヶ月): Cranelift Direct → 600倍高速化目標
  • Phase C (6ヶ月+): LLVM Ultimate → 1000倍高速化目標

🤖 Copilot協調管理

📋 Copilot作業管理

🎯 フェーズ別課題

📊 実装状況追跡

完了済み (Phase 8.2)

  • WASM: 0.17ms (280倍高速化)
  • VM: 16.97ms (2.9倍高速化)
  • ベンチマークシステム完成
  • 3バックエンド統合CLI

🚧 進行中 (Phase 8.3)

  • Box操作WASM対応Copilot実装中
  • RefNew/RefGet/RefSet命令
  • メモリレイアウト最適化

🔜 次期予定 (Phase 8.4+)

  • AOT WASMネイティブ化
  • MIR最適化基盤
  • エスケープ解析実装

📚 関連ドキュメント

📖 技術資料

🔄 進捗管理

  • 定期更新: 毎週金曜日に進捗反映
  • AI会議: 重要決定事項は3AI大会議で検討
  • ベンチマーク: 性能回帰チェック自動実行

最終更新: 2025-08-14 - AI大会議によるネイティブコンパイル戦略確定