docs(joinir): Phase 43/245B Normalized JoinIR completion summary
Complete documentation consolidation for Phases 26-45 Normalized JoinIR
infrastructure. All components are implemented and tested (937/937 PASS).
Key additions:
- PHASE_43_245B_NORMALIZED_COMPLETION.md: Master completion summary
- Architecture components (Mode, Capability, Carriers, DigitPos, etc.)
- Supported loop patterns (P1, P2 variants including JsonParser)
- Complete file reference guide
- Test coverage documentation
- Future expansion roadmap
Updates:
- CURRENT_TASK.md: Moved Phase 43/245B to completed section
- joinir-architecture-overview.md: Phases 43-45 marked complete
- Historical docs: Added completion banners with links
- phase223-loopbodylocal-condition-design.md
- phase223-loopbodylocal-condition-inventory.md
- PHASE_223_SUMMARY.md
- phase245b-num_str-carrier-design.md
- phase245c-function-param-capture-summary.md
Documentation hierarchy established:
- Master summary → individual design docs
- Historical docs → completion summary
- Cross-references complete across all docs
Status: Phase 43/245B Normalized infrastructure COMPLETE ✅