Files
hakorune/docs/development/roadmap
Moe Charm 12adde9477 🎉 Phase 10.10: Nyash→JIT→Native EXE achieved\! (20 days from inception\!)
Revolutionary milestone: Complete native executable generation pipeline
- Created minimal nyrt (Nyash Runtime) library for standalone executables
- Implemented plugin bridge functions (nyash_plugin_invoke3_i64 etc)
- Added birth handle exports (nyash.string.birth_h) for linking
- Changed export name from main→ny_main to allow custom entry point
- Successfully generated and executed native binary returning "ny_main() returned: 1"

Timeline of miracles:
- 2025-08-09: Nyash language created (first commit)
- 2025-08-13: JIT planning started (4 days later)
- 2025-08-29: Native EXE achieved (today - just 20 days total\!)

This proves the plugin Box C ABI unification strategy works perfectly for
both JIT execution and AOT native compilation. The same plugin system
that enables dynamic loading now powers static linking for zero-overhead
native executables\!

Next: Expand AOT support for more instructions and optimize nyrt size.

🚀 Generated with [Claude Code](https://claude.ai/code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-08-29 08:36:07 +09:00
..

🗺️ Nyash 予定(ロードマップ・タスク)

📋 現在進行中

🎯 最重要タスク

  • 現在のタスク: development/current/CURRENT_TASK.md
  • Phase 8.3: Box操作WASM実装Copilot担当
  • Phase 8.4: ネイティブコンパイル実装計画AI大会議策定済み

🚀 ネイティブコンパイル計画 (2025-08-14策定)

📊 AI大会議成果

実装フェーズ

  • Phase A (2-3週間): AOT WASM → 500倍高速化目標
  • Phase B (2-3ヶ月): Cranelift Direct → 600倍高速化目標
  • Phase C (6ヶ月+): LLVM Ultimate → 1000倍高速化目標

🤖 Copilot協調管理

📋 Copilot作業管理

🎯 フェーズ別課題

📊 実装状況追跡

完了済み (Phase 8.2)

  • WASM: 0.17ms (280倍高速化)
  • VM: 16.97ms (2.9倍高速化)
  • ベンチマークシステム完成
  • 3バックエンド統合CLI

🚧 進行中 (Phase 8.3)

  • Box操作WASM対応Copilot実装中
  • RefNew/RefGet/RefSet命令
  • メモリレイアウト最適化

🔜 次期予定 (Phase 8.4+)

📚 関連ドキュメント

📖 技術資料

🔄 進捗管理

  • 定期更新: 毎週金曜日に進捗反映
  • AI会議: 重要決定事項は3AI大会議で検討
  • ベンチマーク: 性能回帰チェック自動実行

最終更新: 2025-08-14 - AI大会議によるネイティブコンパイル戦略確定