Completes Phase 216: Validates Pattern 3 if-sum implementation with actual selfhost test case from apps/tests/phase212_if_sum_min.hako. ## Test Results (All Passing) ### Primary Target - phase212_if_sum_min.hako: RC=2 ✅ - Loop: i=0..2, sum increments when i>0 - Expected: sum=2 (at i=1 and i=2) - Actual: RC=2 ### Regression Tests - loop_if_phi.hako (Pattern 3): RC=2 ✅ - loop_min_while.hako (Pattern 1): RC=2 ✅ - joinir_min_loop.hako (Pattern 2): RC=2 ✅ ## Validation Confirmed Phase 215-2 fixes are production-ready: 1. JoinIR lowerer creates expr_result correctly 2. Boundary builder passes expr_result to pipeline 3. Final return uses merge result (not Void) 4. ExprResult contract matches Pattern 2 ## Architecture Pattern 3 if-sum flow: - Source code → Parser → AST → Pattern3IfPhi detection - JoinIR lowerer (AST extraction + expr_result creation) - JoinInlineBoundary with expr_result - JoinIRConversionPipeline returns merge result - Pattern dispatcher returns expr_result (not Void) - Final MIR function uses actual sum value - VM execution: RC=2 (correct value, not 0) ## Documentation - Added: docs/development/current/main/phase216-selfhost-if-sum-production.md - Updated: CURRENT_TASK.md (Phase 213-216 complete status) 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
Nyash Development Documentation 🔧
開発者向けの進行中タスクと開発計画ドキュメントです。
📂 ディレクトリ構造
current/
CURRENT_TASK.md- 現在進行中のタスク- アクティブな開発作業の詳細
- 最新の実装状況
roadmap/
- phases/ - フェーズ別開発計画
- phase-8/ - AST→MIR変換
- phase-9/ - VM/JIT実装
- phase-10/ - AOT最適化
- native-plan/ - ネイティブビルド計画
- 実行バックエンド統合
- パフォーマンス目標
proposals/
- RFC(Request for Comments)
- 新機能提案
- 設計ディスカッション
🎯 重要な参照先
- 進行状況:
current/CURRENT_TASK.md - 開発計画:
roadmap/phases/ - 技術提案:
proposals/
📝 注意事項
このディレクトリの内容は開発中であり、頻繁に変更されます。
安定した仕様はreference/を参照してください。