Commit Graph

5 Commits

Author SHA1 Message Date
d4b9ae3ba5 feat(joinir): Phase 46 - P2-Mid canonical Normalized promotion
Promote P2-Mid patterns (_atoi real, _parse_number real) to canonical
Normalized→MIR(direct) route, completing P2 line transition.

Canonical set expansion (Phase 41 → Phase 46):
- P2-Core: Pattern2Mini, skip_ws mini/real, atoi mini
- P2-Mid: atoi real, parse_number real (NEW)

All JsonParser P2 loops (_skip_whitespace, _atoi, _parse_number) now
canonical Normalized - Structured→MIR is legacy/comparison-only.

Key changes:
- shape_guard.rs: Expanded is_canonical_shape() (+2 patterns)
  - JsonparserAtoiReal
  - JsonparserParseNumberReal
  - Made NormalizedDevShape enum public
- bridge.rs: Updated canonical routing comments (Phase 41 → 46)
- normalized.rs: Made shape_guard module public
- normalized_joinir_min.rs: Added Phase 46 canonical verification test
- phase46-norm-canon-p2-mid.md: Complete design documentation

Out of scope (deferred):
- P3/P4 Normalized support → NORM-P3/NORM-P4 phases
- Selfhost complex loops → separate phases

Benefits:
- Clear P2 boundary: All JsonParser P2 = Normalized canonical
- Infrastructure validation: Phase 43/245B proven production-ready
- Simplified mental model: P2 = Normalized-first, P3/P4 = future

Tests: 937/937 PASS (lib), 20/20 PASS (normalized_dev feature)
Phase 46 test: test_phase46_canonical_set_includes_p2_mid 
2025-12-12 04:40:46 +09:00
ed8e2d3142 feat(joinir): Phase 248 - Normalized JoinIR infrastructure
Major refactoring of JoinIR normalization pipeline:

Key changes:
- Structured→Normalized→MIR(direct) pipeline established
- ShapeGuard enhanced with Pattern2 loop validation
- dev_env.rs: New development fixtures and env control
- fixtures.rs: jsonparser_parse_number_real fixture
- normalized_bridge/direct.rs: Direct MIR generation from Normalized
- pattern2_step_schedule.rs: Extracted step scheduling logic

Files changed:
- normalized.rs: Enhanced NormalizedJoinModule with DevEnv support
- shape_guard.rs: Pattern2-specific validation (+300 lines)
- normalized_bridge.rs: Unified bridge with direct path
- loop_with_break_minimal.rs: Integrated step scheduling
- Deleted: step_schedule.rs (moved to pattern2_step_schedule.rs)

New files:
- param_guess.rs: Loop parameter inference
- pattern2_step_schedule.rs: Step scheduling for Pattern2
- phase43-norm-canon-p2-mid.md: Design doc

Tests: 937/937 PASS (+6 from baseline 931)

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-12 03:15:45 +09:00
12e2f87c6f Refine normalized bridge direct path and env guard 2025-12-11 22:50:23 +09:00
a4756f3ce1 Add dev normalized→MIR bridge for P1/P2 mini and JP _atoi 2025-12-11 22:12:46 +09:00
af6f95cd4b Phase 33 NORM canon test: enforce normalized dev route for P1/P2/JP mini 2025-12-11 20:54:33 +09:00