|
|
2d5607930c
|
docs(edgecfg): Phase 280 - Frag Composition SSOT Positioning (A→B→C)
## Purpose
Stop pattern number enumeration proliferation by establishing Frag composition API
as the Single Source of Truth (SSOT) for structured control flow → CFG lowering.
Pattern numbers (1-9+) are **symptom labels** for regression tests, NOT architectural
concepts. The architectural SSOT is **Frag composition rules** (seq/if/loop/cleanup).
## Changes Summary
**Phase A (Docs-only, no code)**: SSOT Positioning
- edgecfg-fragments.md: Status Draft → Active SSOT (+243 lines)
- Added 5 sections: Composition SSOT, Rules, Laws, Fail-Fast, Ownership
- Documented 3-tier ownership model (Normalizer/Composition/Lowerer)
- Established composition as pattern absorption destination
- joinir-architecture-overview.md: Pattern absorption documentation (+90 lines)
- Added Section 0.2: Pattern Number Absorption Destination
- JoinIR vs Plan comparison (different extraction, same SSOT)
- Pattern absorption status table (Pattern6/7 as Phase 280 targets)
- phase-280/README.md: Full roadmap (new)
**Phase B (API solidification)**: Contract Verification
- compose.rs: Module-level + function-level Phase 280 docs (+149 lines)
- Documented composition SSOT, ownership model, usage example
- Added constraint/composition law sections to seq/if/loop/cleanup
- Contract verification: All seq/if/loop contracts verified (no gaps)
- Test gap analysis: No missing tests (wires/exits separation explicitly tested)
**Phase C (Pattern preparation)**: Documentation-only
- normalizer.rs: Pattern6/7 TODO comments (+10 lines)
- Pattern6: Early exit doesn't fit compose::if_() → cleanup() target
- Pattern7: 挙動不変保証難 → compose::if_() migration deferred to Phase 281
## Impact
- **Net +460 lines** (docs-heavy, minimal code)
- **4 files modified**, 1 directory created
- **SSOT established**: Frag composition is now THE absorption destination
- **導線固定**: Clear migration path for Pattern6/7 (Phase 281+)
- **No behavior change**: Documentation-only for Phase C (tests not run)
## Phase 280 Goal Achieved
✅ SSOT positioning + 導線固定 (NOT full migration - that's Phase 281)
✅ Phase A complete: Docs updated to "Active SSOT"
✅ Phase B complete: API contract verified and documented
✅ Phase C complete: Pattern6/7 hand-rolled locations documented
## Next Phase (Phase 281+)
- Phase 281: Full Pattern6/7 absorption (replace hand-rolled with compose_*)
- Phase 282: Router shrinkage (pattern numbers → test labels)
- Phase 283+: Pattern8 and beyond
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
|
2025-12-23 01:18:36 +09:00 |
|