feat(edgecfg): Phase 281 P3 - cleanup Normal wiring + docs
This commit is contained in:
@ -1,6 +1,6 @@
|
||||
# Phase 280: ExitKind+Frag Composition SSOT (A→B→C)
|
||||
|
||||
**Status**: In Progress (Started 2025-12-23)
|
||||
**Status**: ✅ Complete (2025-12-23)
|
||||
**Phase Number**: 280
|
||||
**Type**: Design-First (Documentation → Minimal Code)
|
||||
|
||||
@ -10,8 +10,8 @@
|
||||
|
||||
**Strategy**: Three-phase approach (A→B→C):
|
||||
- **Phase A**: Document SSOT positioning (docs-only, no code) ✅ **Complete**
|
||||
- **Phase B**: Solidify composition API contract (minimal test-based verification)
|
||||
- **Phase C**: Prepare Pattern6/7 for composition API (documentation-only, defer migration to Phase 281)
|
||||
- **Phase B**: Solidify composition API contract (minimal test-based verification) ✅ **Complete**
|
||||
- **Phase C**: Prepare Pattern6/7 for composition API (documentation-only, defer migration to Phase 281) ✅ **Complete**
|
||||
|
||||
**Key Insight**: Pattern numbers (1-9+) are **symptom labels** for regression tests, NOT architectural concepts. The architectural SSOT is **Frag composition rules** (`seq`/`if`/`loop`/`cleanup`).
|
||||
|
||||
|
||||
Reference in New Issue
Block a user