feat(edgecfg): Phase 281 P3 - cleanup Normal wiring + docs

This commit is contained in:
2025-12-23 04:11:02 +09:00
parent 2d5607930c
commit a744be929a
9 changed files with 675 additions and 111 deletions

View File

@ -1,6 +1,6 @@
# Phase 280: ExitKind+Frag Composition SSOT (A→B→C)
**Status**: In Progress (Started 2025-12-23)
**Status**: ✅ Complete (2025-12-23)
**Phase Number**: 280
**Type**: Design-First (Documentation → Minimal Code)
@ -10,8 +10,8 @@
**Strategy**: Three-phase approach (A→B→C):
- **Phase A**: Document SSOT positioning (docs-only, no code) ✅ **Complete**
- **Phase B**: Solidify composition API contract (minimal test-based verification)
- **Phase C**: Prepare Pattern6/7 for composition API (documentation-only, defer migration to Phase 281)
- **Phase B**: Solidify composition API contract (minimal test-based verification)**Complete**
- **Phase C**: Prepare Pattern6/7 for composition API (documentation-only, defer migration to Phase 281)**Complete**
**Key Insight**: Pattern numbers (1-9+) are **symptom labels** for regression tests, NOT architectural concepts. The architectural SSOT is **Frag composition rules** (`seq`/`if`/`loop`/`cleanup`).