docs: Update Phase 212.5 completion status and add Phase 213 plan

Phase 212.5 完了を記録し、Phase 213 への継続を明記。

- phase212-5-implementation-complete.md: Phase 213 への継続を追記
- CURRENT_TASK.md: Phase 212.5 完了エントリ + Phase 213 計画を追加

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
This commit is contained in:
nyash-codex
2025-12-09 23:37:18 +09:00
parent aeb6282c2d
commit 577b5b01d5
2 changed files with 193 additions and 2 deletions

View File

@ -214,4 +214,21 @@ loop(i <= 5) { // Actual: i <= 5 (hardcoded)
- [x] Pattern 3 lowerer constraints documented
- [x] Implementation report created
---
## 🔖 Status Update
**Phase 212.5: COMPLETE ✅** (Commit: `aeb6282c`)
**Scope Completed**:
- ✅ Structural if detection (`detect_if_in_body`)
- ✅ Pattern routing logic (classify with `has_if && carrier_count >= 1`)
- ✅ Test verification (Pattern 3 routing confirmed)
- ✅ MIR PHI generation verified
**Out of Scope (Phase 213)**:
Pattern 3 lowerer (`lower_loop_with_if_phi_pattern`) is currently a **test-only PoC implementation** with hardcoded conditions and updates. AST-based generalization for if-sum patterns is handled in Phase 213.
**Next**: Phase 213 will generalize Pattern 3 lowerer to read actual AST conditions and update expressions dynamically.
**Phase 212.5: COMPLETE ✅**