docs(joinir): Phase 43/245B Normalized JoinIR completion summary

Complete documentation consolidation for Phases 26-45 Normalized JoinIR
infrastructure. All components are implemented and tested (937/937 PASS).

Key additions:
- PHASE_43_245B_NORMALIZED_COMPLETION.md: Master completion summary
  - Architecture components (Mode, Capability, Carriers, DigitPos, etc.)
  - Supported loop patterns (P1, P2 variants including JsonParser)
  - Complete file reference guide
  - Test coverage documentation
  - Future expansion roadmap

Updates:
- CURRENT_TASK.md: Moved Phase 43/245B to completed section
- joinir-architecture-overview.md: Phases 43-45 marked complete
- Historical docs: Added completion banners with links
  - phase223-loopbodylocal-condition-design.md
  - phase223-loopbodylocal-condition-inventory.md
  - PHASE_223_SUMMARY.md
  - phase245b-num_str-carrier-design.md
  - phase245c-function-param-capture-summary.md

Documentation hierarchy established:
- Master summary → individual design docs
- Historical docs → completion summary
- Cross-references complete across all docs

Status: Phase 43/245B Normalized infrastructure COMPLETE 
This commit is contained in:
nyash-codex
2025-12-12 04:19:06 +09:00
parent c82ae2365f
commit 297258f963
8 changed files with 407 additions and 28 deletions

View File

@ -1,6 +1,10 @@
# Phase 223-1: LoopBodyLocal in Condition - Comprehensive Inventory
Status: HistoricalPhase 26-H 以降の Normalized / DigitPos 導入で一部内容が古くなっています)
---
**Phase 26-45 Completion**: このフェーズで設計した機能は Phase 43/245B で実装完了。最終状態は [PHASE_43_245B_NORMALIZED_COMPLETION.md](./PHASE_43_245B_NORMALIZED_COMPLETION.md) を参照。
---
Status: HistoricalPhase 26-H 以降の Normalized / DigitPos 導入で一部内容が古くなっています)
Note: LoopBodyLocal が原因で Fail-Fast していたループの在庫を Phase 223 時点で一覧化したメモだよ。DigitPos 系などの一部ループはその後の Phase 224/26-H/34 系で解消済みなので、最新の対応状況は `joinir-architecture-overview.md` と Phase 42 の P2 インベントリを合わせて参照してね。
## Purpose