Commit Graph

1 Commits

Author SHA1 Message Date
d4d415115f Phase 5: Documentation & Task Update (COMPLETE)
Phase 5 Mid/Large Allocation Optimization complete with major success.

Achievement:
- Mid MT allocations (1KB-8KB): +28.9x improvement (1.49M → 41.0M ops/s)
- vs System malloc: 1.53x faster (41.0 vs 26.8 M ops/s)
- Mid Free Route Box: Fixed 19x free() slowdown via dual-registry routing

Files:
- PHASE5_COMPLETION_REPORT.md (NEW) - Full completion report with technical details
- CURRENT_TASK.md - Updated with Phase 5 completion and next phase options

Completed Steps:
- Step 1: Mid MT Verification (range bug identified)
- Step 2: Mid Free Route Box (+28.9x improvement)
- Step 3: Mid/Large Config Box (future workload infrastructure)
- Step 4: Deferred (MT workload needed)
- Step 5: Documentation (this commit)

Next Phase Options:
- Option A: Investigate bench_random_mixed regression
- Option B: PGO re-enablement (recommended, +6.25% proven)
- Option C: Expand Tiny Front Config Box
- Option D: Production readiness & benchmarking
- Option E: Multi-threaded optimization

See PHASE5_COMPLETION_REPORT.md for full technical details and CURRENT_TASK.md
for next phase recommendations.

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-29 14:46:54 +09:00