docs: tone down Phase 75-5 PGO recovery estimates
This commit is contained in:
@ -149,8 +149,8 @@ Phase 75-3 validated C5+C6 inline slots optimization on Standard binary (+5.41%)
|
||||
|
||||
2. **HIGH PRIORITY - PHASE 75-5 (PGO Profile Regeneration)**
|
||||
- Regenerate PGO profile with C5=1, C6=1 training configuration
|
||||
- Expected gain: +5-8% (if profile aligns with actual code optimization)
|
||||
- Estimated recovery: 55.51 M ops/s → ~58-59 M ops/s
|
||||
- Expected gain: unknown (likely positive if the training profile matches the actual hot path, but not guaranteed)
|
||||
- Estimated recovery: treat any number as a hypothesis until re-measured (do not assume a return to Phase 69 levels)
|
||||
- Root cause analysis: Investigate 14% gap vs Phase 69 (layout, code bloat, or profile mismatch)
|
||||
|
||||
**Documentation:**
|
||||
|
||||
Reference in New Issue
Block a user